
SUP-R-WALL
Prefabricated Fibre Cement Permanent Wall Formwork
Sup-R-Wall permanent formwork is designed to speed up the construction programme and provide cleaner and greener building solutions.
Launched in 2013, the Sup-R-Wall building system incorporates permanent formwork for concrete framed buildings with significantly reduced build times.
Sup-R-Wall is much faster to finish compared with traditional formwork methods.
Wet finishing trades are eliminated on site as walls can be spray finished and painted.
Conduits for building services are incorporated within Sup-R-Wall and follow on trades commence much earlier in the construction programme.
Rapid build and cost effective
Sup-R-Wall offers a strong monolithic structure capable of carrying structural loads while at the same time the panels are light weight and manually handled.
Incorporates any building design
Sup-R-Wall can be used on buildings from single unit family homes up to multi-storey apartment and commercial buildings.
The system has been used in buildings across the UK and Ireland.
Start to finish
Sup-R-Wall offers a full Design & Build system approach with engineering design, inspection and certification on completion.
Sup-R-Wall panels are manufactured OFFSITE in Co. Limerick Ireland
Lightweight wall formwork system – Not crane dependant
European Standards
Structural design & certification for completed frame